Capacity

- Maximum belt load of 200 kg for all models
- Belt speed options: 20 meters per minute (slow) and 32 meters per minute (fast)
- Maximum operating angle: 55° across all models

Setup

Requires 1-2 operators, depending on the type and volume of materials being screened.
The Screena must be placed on flat, stable ground, ensuring it can support the combined weight of the machine and the materials being processed.
Operators should perform routine checks to ensure that the screen is properly aligned and that all components are functioning correctly before use.

Portability

Weighing 180 kg, the Screena is easy to transport and reposition, with compact dimensions for efficient storage.
The machine operates on either 110V or 240V power supplies, making it adaptable to various site requirements.
Its folding frame and wheels allow for quick setup and breakdown, reducing downtime between jobs.

Safety

Equipped with emergency stop buttons to immediately halt operations in case of an issue.,
The machine includes an overload protection system, ensuring safe performance even under heavy loads.
Operators are required to use PPE, such as safety glasses, gloves, and protective footwear, and should ensure that power cables are kept clear of moving parts to avoid accidents.

Operational Efficiency

Manual Labor Time

Transporting heavy materials like rubble or soil manually can take 4-5 workers several hours

Efficiency

The Shifta can move these materials continuously with 2-3 operators at much faster rates

Time Savings

The Shifta reduces the transport time by 50% or more compared to manual handling

Manpower Reduction

Instead of 4-5 workers, only 2-3 operators are needed, significantly reducing labor requirements